Full text available in Adobe Acrobat format:
http://www.architectura.actapol.net/volume12/issue2/12_2_101.pdf
Issue 12 (2) 2013 pp. 101–122
Rajmund Leszek Ignatowicz, Krzysztof Górski
REBUILDING A HALL RAILWAY WORKSHOP IN LESZNO AS RESCUE FOR RAILWAY BUILDINGS
Keywords: design of reinforced concrete chamber, FEM numerical model, railway depot, railway wheel drop pit
Abstract: This study is an example of the reconstruction hall depot (WGW), which is located in Leszno. Works include, among other things, the execution and design of the supporting structure for technological equipment in the form of a reinforced concrete chamber. Concerned depot modernization of design and material solutions. The study also illustrates the strengthening of steel structure and describes the numerical model adopted for dimensioning the supporting structure – reinforced concrete chamber – with elements of the coating.
For citation:
EndNote
BibTeX
RefMan
MLA | Ignatowicz, Rajmund Leszek, and Krzysztof Górski. "REBUILDING A HALL RAILWAY WORKSHOP IN LESZNO AS RESCUE FOR RAILWAY BUILDINGS." Acta Sci.Pol. Architectura 12.2 (2013): 101–122. |
APA | Ignatowicz R.L. and Górski K. (2013). REBUILDING A HALL RAILWAY WORKSHOP IN LESZNO AS RESCUE FOR RAILWAY BUILDINGS. Acta Sci.Pol. Architectura, 12 (2), 101–122 |
ISO 690 | Ignatowicz, Rajmund Leszek, Górski, Krzysztof. REBUILDING A HALL RAILWAY WORKSHOP IN LESZNO AS RESCUE FOR RAILWAY BUILDINGS. Acta Sci.Pol. Architectura, 2013, 12.2: 101–122. |
Streszczenie w języku polskim:
http://www.architectura.actapol.net/tom12/zeszyt2/abstrakt-101.html
http://www.architectura.actapol.net/tom12/zeszyt2/abstrakt-101.html