SGGW

Polska Bibliografia Naukowa

Index Copernicus Journal Master List

AGRO

Issue 12 (4) 2013 pp. 135–146

Adam Krajewski, Kazimierz Banasik

RESPONSE TIMES OF URBAN CATCHMENT TO RAINFALL EVENTS

Keywords: lag time, rainfall – runoff, urban catchment, Slużewiecki Creek
Abstract: Analysis of 38 rainfall-runoff events, recorded in a small urban catchment (A = 28.7 km2), located in south-west part of Warsaw, in the period of 2009–2012, has been carried out with the aim of estimating the lag times, and checking they variability. The lag times of recorded events were compared with the estimated ones from empirical formulae. Results of analysis indicated significant variability in lag times among the events (since 1.77 to 15.8 h). Relations between lag time and event characteristics used in selected formulae were not confirmed by the recorded data.
pub/12_4_135.pdf Full text available in Adobe Acrobat format:
http://www.architectura.actapol.net/volume12/issue4/12_4_135.pdf

For citation:

MLA Krajewski, Adam, and Kazimierz Banasik. "RESPONSE TIMES OF URBAN CATCHMENT TO RAINFALL EVENTS." Acta Sci.Pol. Architectura 12.4 (2013): 135–146.
APA Krajewski A. and Banasik K. (2013). RESPONSE TIMES OF URBAN CATCHMENT TO RAINFALL EVENTS. Acta Sci.Pol. Architectura, 12 (4), 135–146
ISO 690 Krajewski, Adam, Banasik, Kazimierz. RESPONSE TIMES OF URBAN CATCHMENT TO RAINFALL EVENTS. Acta Sci.Pol. Architectura, 2013, 12.4: 135–146.
EndNote BibTeX RefMan
Streszczenie w języku polskim:
http://www.architectura.actapol.net/tom12/zeszyt4/abstrakt-135.html