Issue 14 (3) 2015 pp. 35–43
Edyta E. Malinowska
GABION WALL TESTING DURING THE FORCED OVERLOADING IN THE GEOTECHNICAL CENTRIFUGE
Keywords: gabion wall, geotechnical centrifuge, physical and mechanical parameters
Abstract: The paper is referring to the geotechnical centrifuge modelling that is used to prove the gabion facing wall stability. The gabion reinforcement wall is 15.3 meters tall and 17 meters length. The centrifuge model was speed up to 50 g and 75 g, and hadn’t failure. The test results show that the largest settlements under 75 g speed was about 2.25 meters vertically and mainly in the gabion wall and just behind the gabion section. The largest settlements under 50 g speed was about 1.07 meter vertically and 1.8 meters horizontally. The value of the settlement increases with the shortness of the reinforcement. The value of the settlement decreases with the reduction of the gabion spacing in the wall facing. Reinforced gabion retaining wall can work safely. Nevertheless, mechanical and deformation behaviors need to be studied for wide applying in a practical engineering.
For citation:
EndNote
BibTeX
RefMan
MLA | Malinowska, Edyta E.. "GABION WALL TESTING DURING THE FORCED OVERLOADING IN THE GEOTECHNICAL CENTRIFUGE." Acta Sci.Pol. Architectura 14.3 (2015): 35–43. |
APA | Malinowska E.E. (2015). GABION WALL TESTING DURING THE FORCED OVERLOADING IN THE GEOTECHNICAL CENTRIFUGE. Acta Sci.Pol. Architectura, 14 (3), 35–43 |
ISO 690 | Malinowska, Edyta E.. GABION WALL TESTING DURING THE FORCED OVERLOADING IN THE GEOTECHNICAL CENTRIFUGE. Acta Sci.Pol. Architectura, 2015, 14.3: 35–43. |
Streszczenie w języku polskim:
http://www.architectura.actapol.net/tom14/zeszyt3/abstrakt-35.html
http://www.architectura.actapol.net/tom14/zeszyt3/abstrakt-35.html